Road disruptions & closures Road disruptions & closures

st of currently known Council or other/event road closures in the region can be found below.

 

For road closures controlled by Department of Main Roads visit 131 940 Traffic and Travel information website.

Motorists are advised to take caution and observe traffic signs during temporary road closures and use alternate routes.

Road Timeframe traffic arrangement Event/Project
Esplanade, Torquay (Fraser to Alexander streets) 18/04/18 - 2/05/18 Full road closure with detours in place.  Resurfacing works. 
Point Vernon Esplanade (Corfield to Flinders streets) 12/04/18 - 17/04/18 Full road closure with detours in place. Resurfacing works. 
Eatonvale Road, Tinana Underpass April - June 2018 Detours will be in place. Reconstruction of roadway under the Bruce Highway overpass. 
Price Street, Tiaro 10/04/2018 - 20/04/2018 Full road closure on Price Street, between Inman and John Street. The works provide for the widening of Price Street for a distance of approximately 200m between Inman and John Streets.
Intersection of Tooley and Churchill streets 03/04/18 - 18/05/18 Detours in place.  Construction of a roundabout. 
Bideford and Colyton streets intersection March - May 2018 Detours in place Construction of a roundabout
Aimee Drive, Urangan 26/03/18 - June 2018 The duration of works will be conducted under a single lane detour of traffic; the direction of traffic will always flow along Aimee Drive from Pulgul Street towards Moolyyir Road. Kerb and channel replacement.
Walker Street, Maryborough (Stevenson St to Neptune St) 15/01/18 - May 2018 Stage 1 - no access to Walker Street from the northern side streets (Jupiter Street and St Clair Avenue).  Improving the vertical alignment of the roadway, installing new drainage and renewing the existing road pavement.
Main Street, Hervey Bay 29/01/18 - April 2018

Between Christensen Street and Chapel Road / Maggs Hill Road will be inaccessible to motorists. Detours will be put in place encouraging the use of Christensen Street → Madsen Road → Chapel Road as an alternate route.  This stage of works will take approximately 5 weeks to complete. The remaining works will be completed with a single traffic lane allowing two-way traffic under control of temporary traffic signals.

Improving the vertical alignment of the roadway, installing new drainage and renewing the existing road pavement.
Yerra Road 700m north or Pilerwa Road 15/01/18 - April 2018 One way traffic flow under traffic lights for the duration of the project. Reconstruction of Yerra Road

l project timeframes are subject to weather permitting.

For information on roads maintained by Department of Main Roads, visit  131 940 Traffic and Travel information, it aims to be a single source of Traffic and Travel information for Queensland road information, including wet weather road closures.

Other information

Last updated: 08/05/2018