Ariadne Street, Maryborough (Victory - Sydney streets)

Construction of 315m x 2.5 wide sealed shared path.

Read more>> 


Aimee Drive, Urangan (Pulgul to Moolyyir streets) 

Works will consist of replacing 900m of kerb and channel including driveway crossings. 

Read more>>


Alexander Street, Hervey Bay (Lakeside Court to Dayman Street)

Construction of a footpath and kerb ramp.

Read more>>


Alfred, Tooley and Hawthorne streets, Maryborough (Ellena to Railway)

The project includes flank sealing of Alfred, Tooley and Hawthorne streets.

Read more>>


Bauple Drive, Bauple (Road Augementation Crest 3)

Council will undertake works to widen Bauple Drive, Bauple.

Read more>>


Bazaar Street, Maryborough (Alice to Albert streets)

Replacement of approximately 200m of existing footpath, kerb and channel replacement and pavement rehabilitation.

Read more>>


Boronia Drive, Poona

Re-profiling of the existing table drain with a concrete invert along the northern side of Boronia Drive between Road 527 and Hakea Terrace.

Read more>>


Cardigan Street, Granville - (Arnaud - Banana streets)

Construction of new kerb and channel, road widening, sealing and stormwater drainage.

Read more>>


Eatonvale Road, Tinana

Reconstruction of 215m of roadway near the underpass on Eatonvale Road, Tinana

Read more>>


Ferry Street, Maryborough - (Alice - Kent streets)

Replace and construct footpaths in Ferry Street on both sides from Kent to Alice streets.

Read more>>


Gilston Road, Wondunna - (Gilston to Dooloong South roads)

Construction of 560 metres of 2.5 footpath.

Read more>>


Gympie Road, Tinana - (Cornwell Street to Eatonvale Road)

Construction of a footpath and a section of kerb and channelling.

Read more>>


Lower Mountain Road, Dundowran (16-56 Lower Mountain Road)

Stage 2 works will include the reconstruction of approximately 530m of Lower Mountain Road.

Read more>>


Main Street, Hervey Bay Construction Stage 3B

Council will undertake works to improve the vertical alignment in this section of Main Street, completely reconstructing the road pavement and associated drainage works increasing the safety for all road users.

Read more>>


Old Maryborough Road & Romney Street Intersection Upgrade

Council will undertake works to improve the intersection of Old Maryborough Road and Romney Street. 

Read more>>


Pialba-Burrum Heads Road (Crawford to Waterview Drive)

Replacement of concrete lined table drain.

Read more>>


Pioneer Drive, Tinnanbar 

Installation of 500m of concrete lined table drain along the southern side of Pioneer Drive. 

Read more>>


Pohlmann Road, Yengarie

Works will consist of the removal of the asphalt over the existing floodway and replacement with concrete surfacing for approximately 60m.

Read more>>


Raward Road,  Wondunna Drainage Channel

Works will consist of additional concrete invert works to improve the Raward Road drainage Channel. 

Read more>>


Tooley and Churchill streets, Maryborough - roundabout

Reconstruction of the intersection of Tooley and Churchill streets, Maryborough.

Read more>>


Tooth Street, Point Vernon (Hythe - Martin streets)

Works will consist of road upgrade works, reconstruction, new kerb and channel, footpaths, and drainag improvements.

Read more>>


Urraween Road, Urraween (Nissen - Main streets)

Works will consist of the construction of a two-lane road with centre median and provision for future intersection connections.

Read more>>


Walker Street, Maryborough Stage 1

The project involves improving the vertical alignment of the roadway while at the same time installing new drainage and renewing the existing road pavement.

Read more>>


Yerra Road, Yerra - Stage 3 - Road Augmentation

Reconstruction of a section of Yerra Road, 700m north of Pilerwa Road.

Read more>>

 