Completed Road Works

Hervey Bay

Asphalt and Bitumen Resurfacing (St Andrews Drive) Asphalt and bitumen resurfacing
Asphalt crack sealing - Craignish, Burrum Heads, Kawungan, Tinana  Asphalt crack sealing
Asphalt Resurfacing - Maryborough and Hervey Bay - Package 1 Asphalt resurfacing
Asphalt resurfacing - Service Rd Boat Harbour Dr, Tooth St, Banksia Park Dr, Long St  Asphalt resurfacing
Avion Development Project - Hervey Bay Airport  Groundworks
Beach Road and Watson Street Raised priority crossing
Beach Stairs - Point Vernon and Urangan  Replace access stairs
Bituminous reseals (various areas)  Bitumen resealing
Bituminous reseals (Fraser Coast Region) Road reseals - various locations
Burrum Heads, SES Driveway Driveway works
Bus Stop Upgrades - Dundowran and Hervey Bay Upgrades
Bus stop upgrades, Hervey Bay, Craignish and Toogoom Bus Stop upgrades
Bus Stop upgrades - Hervey Bay, Toogoom and Dundowran Bus Stop upgrades
Caddy Avenue  Road reconstruction
Cameron Court  Footpath replacement
Campbell Street (between Bideford St and Fraser St)  Footpath construction
Chapel Road, Madsen Road and Wood Road intersection  Construction of a roundabout at the Chapel Road/Madsen Road and Woods Road intersection
Citrus Drive and Averial Close, Dundowran  Pavement renewal
Corser and Long Streets intersection Lighting upgrade
Craignish Road (Hornes Road to Karraschs Road) and Hornes Road (Craignish Road to Cord Road upgrade area) Pavement rehabilitation works
Davis Drive to 63-65 McLiver Street  Footpath works
Dayman Street (Elizabeth Street to Hansen Street) Asphalt resurfacing
Doolong Road South (part of) Pavement reconstruction
Driftwood Court Road reconstruction
Dundowran Road (Pialba Burrum Heads Road to Lower Mountain Road)  Pavement reconstruction
Elizabeth Street to Bideford Street  Links corridor lighting replacement
Elizabeth Street and Shell Street  Intersection upgrade
Esplanade, Urangan, between Ann and Crown Street and between Elizabeth and Churchill Streets Footpath replacement - shard path cycleway
Exeter Street - (Bideford to Robert) Footpath replacement
Exeter Street and Tavistock Street Intersection upgrade
Frangipanni Ave and Eugenia Way Footpath works
Herbert Street - Miller to Edward Streets Footpath construction
Honiton Street (Torquay Terrace to Links Corridor) Road and drainage works
Howard Street (Burrum Heads Road to Torbanlea Street)  Pavement Reconstruction
Islander Road (to Beach Road) - NIGHT WORKS (Map of area) Sealed road maintenance
Kingfisher Parade Footpath construction
Lifting of Service Lids  Alterations to hydrant covers, service valve covers, sewer and stormwater manholes
Links Corridor - Elizabeth Street to Bideford Street  Pathway lighting upgrade
Main Street, Chapel Road and Maggs Hill Road Intersection 
Stage 1 - Traffic Guidance Scheme 
REVISED - 18 December 2020 - Traffic Guidance Scheme 
Traffic plan - sideworks - Revised Traffic Scheme 
Relocation of services and roundabout project at the Main Street intersection
Masters Court, Dean Court, McLiver Street, Katandra Street, Parraweena Court and Cumberland Court  
McLiver Street and Davis Drive Intersection upgrade
Main Street (Vicinity of Main Street and McLiver Street Intersection) Footpath construction
Main Street and Torquay Road - Undergrounding of Electricity Conduits Electricity conduit undergrounding
Medical Place Raised priority crossing
Miller Street (Esplanade to Bucaneer Drive) Footpath construction
Miller Street (Pulgul Street to Herbert Street) Footpath construction
Moes Road Floodway replacement
Moolyyir Street and Esplanade - Concept plan Footpath construction
Moreton Street Footpath construction
Nissen Street  Stormwater drainage maintenance works
Nissen Street  Pedestrian refuge crossing
North Area - Burrum Heads and Torbanlea  Replacement of kerb ramps
Petersen Road  Carpark and walkway construction
Pier Park Replacement of lighting
Pier Park Drainage Outfall Replacement of geotextile sand containers
Pier Park - Stevenson Mathison footbridge  Replace timber decking
Pier Street Road widening and kerb and channel construction
Piggford Lane (Maryborough Hervey Bay Road to 400m west) Road Construction
Pulgul and Moolyyir Street intersection Intersection upgrade
Rail Trail - Hervey Bay (Elizabeth to Hunter Streets)  Renewal
Raward Road (Stage 4) Drainage
Raward Road - Stage 4B  Drainage
Removal of Loose Rock - Urangan Seawall Seawall upgrade
River Heads Carpark Upgrades  Carpark works
Sand Road (traffic plan) Pavement works
Sectional Footpath Repairs Hervey Bay Sectional replacement concrete footpaths
Southernden Street Road pavement replacement
Tavistock Street (Boundary Road to Sport and Leisure Park Road) Concrete Footpath
Tavistock and Totness Street  Footpath reconstruction
Thornbill Avenue Pavement replacement
Toogoom Footbridge Replace timber decking
Torquay Road and Taylor Street intersection - NIGHT WORKS (Map of area) Sealed road maintenance
Torquay Road (Main Street to Hunter Street) - NIGHT WORKS (Map of area) Sealed road maintenance
Torquay Road (Queen Street to Denmans Camp Road) Road reconstruction
Urangan Pier (adjacent) Replace beach outlets
Urraween Road (Maryborough Hervey Bay Road to Madsen Road) Road widening
Urraween Road (Maryborough Hervey Bay Road to Madsen Road) Footpath construction
Urraween Road (between Maryborough Hervey Bay Road and Pantlins Lane) Pedestrian bridge construction
Urraween Road (Main Street to Richard Charles Drive) Footpath construction
Watson Street (Beach Road to George Street) Footpath construction 
Wedge Street (Fairway Drive to Caddy Avenue)  Road reconstruction

Maryborough

Abbott Road (Sykes Road to end of Abbott Road) Road Reconstruction
Ann Street (Guava Street to Wyland Street) Road widening
Albert Street Kerb and channel works and asphalt replacement
Albert Street and John Street intersection Intersection Upgrade
Ann Street Raised priority crossing
Ann Street and Adelaide Lane  Intersection upgrade
Ariadne Street and Sydney Street Road and footpath works
Asphalt crack sealing - Craignish, Burrum Heads, Kawungan, Tinana  Asphalt crack sealing
Asphalt Resurfacing Maryborough and Hervey Bay - Package 1 Asphalt resurfacing
Banana Street Road reconstruction
Banana Street (Odessa Street to Gick Street) Footpath construction
Bitumen reseals - various areas  Bitumen reseals
Bituminous reseals (Fraser Coast Region) Road reseals - various locations
Brolga Theatre - Retaining wall Removal of retaining wall
Bus Stop Upgrades - Maryborough Upgrades
Cambridge Street  Footpath construction
Cardigan and Arnaud Streets Footpath upgrade and kerb and channel construction
Churchill Street (between Yaralla Street and Ariadne Street) Road and drainage works
Cran Street, Tinana Sectional kerb and channel replacement
Doon Villa Avenue (John Street to Lennox Street) Kerb and channel replacement
Eatonvale Road  Road reconstruction
Elliott Street Bitumen reseals
Elstow Street Road upgrade
Ferry Street (Thomas to Alice Street) Footpath construction
Ferry Street (between Meredith Street and Ellena Street) Sectional kerb and channel replacement
Fort Street and Albert Street Intersection Intersection upgrade
Frank Street (Frank Street to Woodstock Street) Pathway replacement
Frank Street (Cheapside Street to Palls Street) Replacement of kerb and channel
Gillhespy Street (Bedford Street to Victory Street) Replacement of kerb and channel
Guava Street (Alice Street to Kent Street) Road reconstruction
Hutchins Street  Replace kerb and channel
Island Plantation Road Open channel works
Keith Street Sectional Kerb and Channel and Footpath Replacement 
Kent Street (Ferry Street to the railway line) Footpath replacement
Lennox Street (Railway line to Walker Street)  Pavement rehabilitation
Lennox Street (Walker Street to Churchill Street) Road pavement rehabilitation
Lennox Street (Alice to Ellena Street) Drainage replacement
Leslie Drive, Tinana Pavement rehabilitation
Lifting of Service Lids Alterations to hydrant covers, service valve covers, sewer and stormwater manholes
Maryborough - Biggenden Road and Royle Street  Intersection improvements
Maryborough CBD revitalisation project  Various
Mary to Bay Rail Trail Construction (Walker Street to Quarry Road) Construction of a gravel trail
Nahrung Road, North Aramara  Bridge Replacement
Neerdie Road Road construction/re-alignment
Neptune Street (Winston Noble Drive to Walker Street) Footpath construction
Pallas Street (Walker Street to Ella Street) Footpath construction
Panorama Drive (Vista Street to Bryant Street) Kerb and channel replacement
Park and Ashton Streets Footpath upgrade and kerb and channel construction
Perry Street (Steindl Street to Banana Street) Kerb and channel replacement
Pioneers Rest Bridge Demolition
Pleasant Street Table drain reformation
River Road - Stage 1 Chainage  Pavement reconstruction and widening
Royle Street  Footpath construction
Russell Street (Kent to Walker Street)  Footpath construction
Saltwater Creek Road (Ellis to Nuneaton Street) Footpath replacement
Saltwater Creek Road (Sydney Street to St Helens School)  Stage three - Footpath replacement
Saltwater Creek Road (Waterston Street to Woodrow Street)  Footpath replacement
Scott Street (March St to Zante St) Kerb and channel replacement
Sectional Footpath Replacements Maryborough  Sectional replacement concrete footpaths
St Mary's bridge replacement  Bridge Replacement
Tambaroora Street (Woodrow Street to Edith Street) Reconstruction of table drain and invert drain
Tanner Street (Alice Street to Edward Street) Kerb and channel replacement
Tapscott Street (Taylor Street to Annie Street and Taylor St to 60m north) Kerb and channel replacement
Teddington Road - Stage 2 (Iindah Road to No.2 Lawson Drive) Road reconstruction
Tooley Street and Albert Street  Intersection upgrade
Tooley Street (Frank to Woodstock Street) Road reconstruction
Tulipwood Drive (Walworth Street to Figtree Way) Sectional kerb and channel replacement
Urangan South Structure Plan  Road and drainage corridor
Walker Street Upgrade, including signalisation of Walker/Neptune Streets Intersection 
Staged Traffic Guidance Schemes 
Road reconstruction, new kerb and channel, traffic lights
Walker Street and Neptune Street  Underground Electricity works in preparation for Traffic lights
Walker Street (Pallas Street to Ferry Street) Road reconstruction
Walworth Street (Gympie Road to Tulipwood Drive)  Kerb and channel
Wharf Street - March Street end Pavement Rehabilitation
Woodstock Street and Ariadne Street Intersection Intersection upgrade
Woodstock Street (Bell to Bryant Street)  Kerb and channel replacement
Woodstock Street (Cheapside St to Ariadne St) Footpath construction
Woodstock Street and John Street Intersection  Pavement Rehabilitation
Woodstock Street (Neptune to Bryant St)  Footpath construction
Woodstock Street (between Neptune Street and Frank Street) Footpath construction
Woongool Road, Tinana Removal and reinstatement of drainage culvert

Townships

Abbott Road (Sykes Road to end Abbott Road) Glenwood  Road reconstruction
Abbott Road, Glenwood Road pavement rehabilitation
Arborten Road Road pavement rehabilitation
Bakers Road, Bauple Floodway construction
Bitumen reseals - various areas Bitumen reseals
Bituminous reseals (Fraser Coast Region) Road reseals - various locations
Burrum Heads, SES Driveway Driveway works
Emerys Bridge Road, Netherby  Bridge replacement
Forgan Lane, Tiaro Footpath construction and concrete bus stop hardstand area
Inman Street and Kooringa Road Oneway and on-street parking
Martha Street, Howard Road reconstruction
Musket Flat Road Road reconstruction
Nahrung Road, North Aramara Bridge replacement
Neerdie Road, Glenwood Road reconstruction/realignment
North Aramara Road, North Aramara Bridge replacement
Pilerwa Road, Mungar Road reconstruction
Pleasant View Road, Yengarie Road reconstruction
Thinoonmba Road Bridge replacement
Tinnanbar Boat Ramp Shoulder maintenance work
Toogoom Road Road reconstruction and drainage works
Tuan Esplanade turnaround Upgrade and construction of turnaround facility

Road Works