Completed Road Works

Hervey Bay

Asphalt crack sealing - Craignish, Burrum Heads, Kawungan, Tinana  Asphalt crack sealing
Asphalt resurfacing - Service Rd Boat Harbour Dr, Tooth St, Banksia Park Dr, Long St  Asphalt resurfacing
Avion Development Project - Hervey Bay Airport  Groundworks
Beach Stairs - Point Vernon and Urangan  Replace access stairs
Burrum Heads, SES Driveway Driveway works
Bus Stop Upgrades - Dundowran and Hervey Bay Upgrades
Caddy Avenue  Road reconstruction
Cameron Court  Footpath replacement
Campbell Street (between Bideford St and Fraser St)  Footpath construction
Citrus Drive and Averial Close, Dundowran  Pavement renewal
Corser and Long Streets intersection Lighting upgrade
Davis Drive to 63-65 McLiver Street  Footpath works
Driftwood Court Road reconstruction
Esplanade, Urangan between Ann and Crown Street and between Elizabeth and Churchill Streets Footpath replacement - shard path cycleway
Herbert Street - Miller to Edward Streets Footpath construction
Howard Street (Burrum Heads Road to Torbanlea Street)  Pavement Reconstruction
Kingfisher Parade Footpath construction
Lifting of Service Lids  Alterations to hydrant covers, service valve covers, sewer and stormwater manholes
Links Corridor - Elizabeth Street to Bideford Street  Pathway lighting upgrade
Main Street, Chapel Road and Maggs Hill Road Intersection 
Stage 1 - Traffic Guidence Scheme 
REVISED - 18 December 2020 - Traffic Guidence Scheme 
Traffic plan - sideworks - Revised Traffic Scheme 
Relocation of services and roundabout project at the Main Street intersection
Miller Street (Pulgul Street to Herbert Street) Footpath construction
Moolyyir Street and Espanade - Concept plan Footpath construction
North Area - Burrum Heads and Torbanlea  Replacement of kerb ramps
Petersen Road  Carpark and walkway construction
Pier Park - Stevenson Mathison footbridge  Replace timber decking
Pier Street Road widening and kerb and channel construction
Piggford Lane (Maryborough Hervey Bay Road to 400m west) Road Construction
Rail Trail - Hervey Bay (Elizabeth to Hunter Streets)  Renewal
Raward Road (Stage 4) Drainage
Sectional Footpath Repairs Hervey Bay Sectional replacement concrete footpaths
Tavistock Street (Boundary Road to Sport and Leisure Park Road) Concrete Footpath
Tavistock and Totness Street  Footpath reconstruction
Thornbill Avenue Pavement replacement
Torquay Road (Queen Street to Denmans Camp Road) Road reconstruction
Urangan Pier (adjacent) Replace beach outlets
Urraween Road (Maryborough Hervey Bay Rooad to Madsen Road) Road widening
Watson Street (Beach Road to George Street) Footpath construction 
Wedge Street (Fairway Drive to Caddy Avenue)  Road reconstruction

Maryborough

Ann Street (Guava Street to Wyland Street) Road widening
Albert Street Kerb and channel works and asphalt replacement
Asphalt crack sealing - Craignish, Burrum Heads, Kawungan, Tinana  Asphalt crack sealing
Banana Street Road reconstruction
Banana Street (Odessa Street to Gick Street) Footpath construction
Bus Stop Upgrades - Maryborough Upgrades
Doon Villa Avenue (John Street to Lennox Street) Kerb and channel replacement
Elstow Street Road upgrade
Guava Street (Alice Street to Kent Street) Road reconstruction
Hutchins Street  Replace kerb and channel
Lennox Street (Railway line to Walker Street)  Pavement rehabilitation
Leslie Drive, Tinana Pavement rehabilitation
Lifting of Service Lids Alterations to hydrant covers, service valve covers, sewer and stormwater manholes
Maryborough - Biggenden Road and Royle Street  Intersection improvements
Neptune Street (Winston Noble Drive to Walker Street) Footpath construction
Pallas Street (Walker Street to Ella Street) Footpath construction
Perry Street (Steindl Street to Banana Street) Kerb and channel replacement
Pioneers Rest Bridge Demolition
Pleasant Street Table drain reformation
River Road - Stage 1 Chainage  Pavement reconstruction and widening
Royle Street  Footpath construction
Russell Street (Kent to Walker Street)  Footpath construction
Saltwater Creek Road (Sydney Street to St Helens School)  Stage three - Footpath replacement
Saltwater Creek Road (Waterston Street to Woodrow Street)  Footpath replacement
Sectional Footpath Replacements Maryborough  Sectional replacement concrete footpaths
Tambaroora Street (Woodrow Street to Edith Street) Reconstruction of table drain and invert drain
Tanner Street (Alice Street to Edward Street) Kerb and channel replacement
Tooley Street (Frank to Woodstock Street) Road reconstruction
Walker Street Upgrade including signalisation of Walker/Neptune Steets Intersection 
Staged Traffic Guidenece Schems 
Road reconstruction, new kerb and channel, traffic lights
Walker Street and Neptune Street  Underground Electricity works in preparation for Traffic lights
Walworth Street (Gympie Road to Tulipwood Drive)  Kerb and channel
Woodstock Street (Cheapside St to Ariadne St) Footpath construction
Woodstock Street and John Street Intersection  Pavement Rehibilitation
Woodstock Street (Neptune to Bryant St)  Footpath construction
Woongool Road, Tinana Removal and reinstatement of drainage culvert

Townships

Burrum Heads, SES Driveway Driveway works
Pilerwa Road, Mungar Road reconstruction
Pleasant View Road, Yengarie Road reconstruction
Thinoonmba Road Bridge replacement
Tuan Esplanade turnaround Upgrade and construction of turn around facility